Header Jahreshöchstlast

Annual peak load and load curve

The load curve in the form of the grid feed-in is the sum of all feed-ins from composite transfer points, power plants and distribution grids into the extra-high voltage grid (grid area 1) of TenneT TSO GmbH

Load curve

The load curve is the sum of the grid losses and all purchases (own consumption) of the connected converter platforms and wind farms in the grid of the offshore company

Provisional annual peak load

The annual peak load corresponds to the maximum value of the respective load curve in a calendar year. You can see the annual peak load by selecting "this year" in the date range picker. The minimum and maximum values are marked with an arrow in the curve chart.

Annual peak load

in the years 2016–2024

2024 Maximum voltage

44 MW on 30.01.2023 12:00pm

2023 Maximum voltage

46 MW on 04.11.2023 1:15am

2022 Maximum voltage

44 MW on 19.01.2022 3:30am  

2021 Maximum voltage

41 MW on 15.07.2021 00:30am

2020 Maximum voltage

45 MW on 27.07.2020 9:15pm  

2019 Maximum voltage

48 MW on 28.09.2019 00:30am

2018 Maximum voltage

38 MW on 27.07.2018 8:30pm

2017 Maximum voltage

40 MW on 03.08.2017 8:00am

2016 Maximum voltage

25 MW on 28.10.2016 1:30am