Annual peak load and load curve

The load curve in the form of the grid feed-in is the sum total of all feed of grid transfer points, power plants, and distribution networks into the maximum voltage network (network area 1) in the control area of TenneT TSO GmbH.

Maximum voltage network load curve

The load curve is the sum of the grid losses and all purchases (own consumption) of the connected converter platforms and wind farms in the grid of the offshore company

Provisional annual peak load

The annual peak load corresponds to the maximum value of the respective load curve in a calendar year. You can see the annual peak load by selecting "this year" in the date range picker. The minimum and maximum values are marked with an arrow in the curve chart. 

 

Maximum value:
Minimum value:
No data available for the selected timeframe

Annual peak load of the years 2016-2023

2016
Maximum voltage

25 MW on 28.10.2016 1:30am

2017
Maximum voltage
40 MW on 03.08.2017 8:00am
2018
Maximum voltage
38 MW on 27.07.2018 8:30pm
2019
Maximum voltage
48 MW on 28.09.2019 00:30am
2020
Maximum voltage
45 MW on 27.07.2020 9:15pm
2021
Maximum voltage
41 MW on 15.07.2021 00:30am
2022
Maximum voltage
44 MW on 19.01.2022 3:30am
2023
Maximum voltage
46 MW on 04.11.2023 1:15am